Apply the slurry to your new concrete wall by holding the trowel blade to the wall so the slurry is pressed onto it and wiping the slurry across the wall with a smooth arcing motion.
How to finish poured concrete walls.
Applying finish is a process wherein the concrete wall is strengthened and prepared for being painted.
Evenly coat a 2 by 2 foot area.
Concrete walls are commonly seen in households and commercial buildings.
They are slightly porous.
Create contraction joints every 4 6 feet.
He spaces fasteners every 6 ft.
Space fasteners every 6 ft.
See below for more information on contraction joints remove forms and install waterproofing and drainage system.
And within 6 in.
Poured concrete wall average cost.
Several factors determine the cost of a poured concrete wall such as the dimensions of the wall the thickness its height and its length the number of reinforcements present and the quality and type of concrete used.
Stand on the stepladder to reach the highest points of the walls if necessary.
These walls are either constructed from concrete blocks or poured concrete.
Go for a solid color or get wild and.
Paint your cinder block 5 13 basement walls of cinder block brick or even poured concrete can be transformed pretty quickly and simply with a coat of paint.
Trowel a 3 8 inch layer of concrete over the wall with a straight trowel.
Saturate the scrub brush in the soapy water and wash the cement walls thoroughly with the soap to remove dirt and dust from the concrete surface.
Pour footings and wall.
At first hold the trowel almost flat elevating the leading edge just enough to avoid gouging the surface.
And within 6 in.
If the wall exceeds four feet in height footings should be poured separately.
Allow concrete to cure.
Troweling is one of the trickier steps in concrete finishing.
First put construction adhesive on the floor then tip the wall into place and fasten with concrete nails or screws.
For a really smooth finish repeat the troweling step two or three times letting the concrete harden a bit between each pass.
Allow the concrete to dry for approximately 30 minutes until most of the moisture is gone from the top.
Concrete walls have a tendency to absorb water i e.
This is a good size area to work in so the drying of the slurry does not go faster then your ability to rub out the wall.
Fill the bucket with warm water and add two or three squirts of dishwashing soap to the bucket.
Finish the surface of the wall as desired.
Phil fastens his walls to the floor with construction adhesive and a powder actuated tool pat.